Specifying sub-metering during construction costs a fraction of a post-occupancy retrofit. Deliver a pre-commissioned, IGBC / GRIHA green building compliant smart water network alongside the keys — an asset the incoming association inherits on Day 1.
Earn up to 6 Green Building Credits for IGBC, GRIHA & LEED.
Specifying SmartSync smart sub-metering qualifies your project for high-tier environmental ratings by providing verifiable, automated water accounting.
Mandatory smart sub-metering points for residential units & common amenities.
Automated data logging & remote hourly telemetry without manual readers.
Sub-metering of major indoor end-uses & cooling tower make-up loops.
From design to handover in 4 streamlined stages.
Click each phase to inspect technical deliverables for your project MEP and site execution teams.
1. MEP & Plumbing Design Phase
SmartSync engineering team provides 3D CAD/BIM block dimensions for plumbing shafts. Standard DN15/DN20/DN25 inline threaded assemblies ensure seamless piping.
Technical Specifications & Compliance
Engineered to meet statutory Indian and international sub-metering standards.
What is Included
- Pre-Commissioned IoT Infrastructure
- Digital Handover Ready on Day 1
- IGBC & GRIHA Green Building Points
- Zero-Wiring Wireless Sub-GHz Architecture
- Standard Inline Plumbing Dimensions
- Centralized Gateway for Entire Towers
- Turnkey Project Commissioning SLA
- Full Developer-to-RWA Admin Transfer